Binder coverage
5/9
Inspection log, Chain of custody, Annual report, BMP maintenance
Resolve gaps5 of 9 required record types on file · 5 total uploads · 4 gaps to close
Inspection log, Chain of custody, Annual report, BMP maintenance
Resolve gapsLab report · q1-lab-results.pdf · Consultant review required before report packet.
SWPPP / SWPCP · rivergate-current-swppp.pdf · Mark this as the authoritative plan shown during an inspection.
Site map · rivergate-site-map.pdf · Outfalls 001/002 and catch basin row labeled.
Permit · rivergate-1200z-permit.pdf · Renewal reminder should stay visible.
Training record · stormwater-training-roster.pdf · Two new yard staff need signatures.
Missing from the regulator packet manifest.
Missing from the regulator packet manifest.
Missing from the regulator packet manifest.
Missing from the regulator packet manifest.